Iklan
President Expects Integrated Growth Points
President Joko “Jokowi” Widodo hopes that the construction of the 1,150-kilometer Trans-Java toll road from Merak in Banten to Banyuwangi in East Java, which is expected to be completed in 2019, can facilitate the development of economic growth points.
PASURUAN, KOMPAS — President Joko “Jokowi” Widodo hopes that the construction of the 1,150-kilometer Trans-Java toll road from Merak in Banten to Banyuwangi in East Java, which is expected to be completed in 2019, can facilitate the development of economic growth points.
The economic growth points range from industrial estates and ports to tourism destinations. Thus, the toll road construction not only increases the mobility of people and goods, but also encourages economic growth.